21-0077- Repair Taxiways E, G & L F1340i; MacDill AFB, FL

The work includes survey, design, demolition, provision, and construction of the following as located and limited by the bid plan set and incidental related work.

  1. Comply with all MacDill AFB Security Forces (SFS) requirements including, but not limited to, providing SFS qualified airfield escorts, security vetting of personnel and equipment, and Base entry hold and search procedures.
  2. Provide, install, maintain, relocate, and remove temporary taxi lines and lighted barricades in accordance with the final negotiated phasing and maintenance of airfield traffic plans.
  3. Eliminate the possibility of Foreign Object Damage (FOD) by sweeping during all work periods and when directed by Airfield Management, all areas traversed by or under the influence of Contractor’s work and equipment.
  4. Provide Engineer of Record (EOR) services to create a signed and sealed Issued For Construction (100%) drawing and specification set based on the 35% bid documents, intervening Government review comments, and the Whole Building Design Guidance, Unified Facilities Criteria (UFC) and the Unified Facilities Guide Specification (UFGS).
  5. Mill and overlay-pave Taxiway Echo, Golf, and Lima.
  6. Prior to overlay paving inspect the milled surface and report to the Government the extent and severity of visible cracks on the milled surface. Perform crack sealing of visible cracks on the milled surface as directed by the Government.
  7. Install a geotextile, crack control fabric, pavement interlayer within Taxiway Lima overlay pavement.
  8. Remove, store and protect, as well as re-install after overlay paving Taxiway Golf and Lima asphalt shoulder in-pavement lighting. Cover and protect in-pavement lighting bases. Provide location services and coring of overlay pavement as required to re-install lighting. This effort to be segmented and executed in accordance with the final negotiated phasing plan.
  9. Provide, maintain and remove airfield lighting circuiting as required to preserve the functionality of all in-pavement lighting to remain in place. This effort to be segmented and executed in accordance with the final negotiated phasing plan.
  10. Mill and overlay-pave Taxiway Golf and Lima asphalt shoulders.
  11. Fog seal Taxiway Echo asphalt shoulders.
  12. Remove airfield pavement markings within Taxiway Echo asphalt shoulders, as well as beyond the limit of project paving and sealing as required to facilitate the final negotiated airfield marking plan.
  13. Remark airfield surfaces in accordance with the final negotiated airfield marking plan.

Site visit 08/08/26 after the 9am GC meeting- conference room Bldg. 30.

RFI's due to ABBA by 4pm 08/11/26.

Bid Due Date: 09/03/2026