The work generally consists of: This is a full facility sustainment project that will address maintenance, repairs, and lifecycle replacement for buildings, building equipment and systems, utilities, and components of the 16,250 square foot square foot Readiness Center and supporting assets to keep them in good working order.
The project will include sustainment maintenance and repair of items that at nearing or at the end of their useful life, failing or failed, including complete replacement of items as necessary, which is a function of the Sustainment Work Classification.
Work may include, but is not limited to, the following:
• General maintenance/repair activities to exterior of buildings and structures to keep them in good working order (e.g. seal building envelope(s) from the elements).
• General maintenance/repair activities in the Readiness Center and support building(s) functional areas outlined in NG PAM 415-12 (e.g. painting, flooring replacement, replace ceiling tiles as necessary, etc.).
• Repair/replacement of latrines/showers, fixtures, tile, flooring, lockers, etc.
• Repair/replacement of electrical systems/components.
• Repair/replacement of water systems and components (potable/non-potable, sewage, irrigation, fire suppression, etc.).
• Repair/replacement of HVAC systems/components.
• Repair/replacement of fire alarm system/components (alarm, mass notification system, fire suppression system, etc.).
• Repair/replace communications system/components as necessary.
• Repair/replace windows as necessary in order to maintain a secure and efficient facility.
• Repair/replace fencing/gates as necessary in order to maintain a secure facility.
• Repair/replace interior and exterior lighting as necessary.
• Repair/replace Anti-Terrorism-Force Protection (ATFP) measures as necessary.
• Drainage/grading work to address any site drainage/stormwater requirements as necessary.
• Repair/replace signage as necessary.
• Other sustainment work that is found to be necessary to keep the facility in good working order.
Building must meet Florida Building Code, State Fire Marshall, local Authorities Having Jurisdiction and Area Water Management requirements, and any other permits and fees required by other county, local or state authorities.