17-1005 Replace Generators, South Substation FAC1395; Patrick Space Force, FLBid Due Date: Thursday , 09/23/2021 at 04:00 pm

RFI's answered 09/22/2021.  Increase in period of performance from 365 to 420 days. No change in due date.

Scope of work: The project calls for a proposal to provide all labor, equipment, materials, and transport needed in performing all work required to repair, by replacement, four (4) existing emergency backup power/load control generators at the South Substation with three (3) new generators that comply National Emission Standards for Hazardous Air Pollutants (NESHAP) for Reciprocating Internal Combustion Engines (RICE).

Site visit 09/13; should you want to attend please send the badge form back to ABBA no later than noon 09/08/21.

RFI's due to ABBA by noon 09/17/21.

 