W911YN-18-R-0001: Florida National Guard Construction MATOC; Jacksonville, FloridaBid Due Date: Monday , 04/23/2018 at 03:00 pm

Responses to Questions 4.12.18 added on 4/13.

Amendment 01 added on 4/5. Additional SITE VISIT...see below. Please let us know if you will base access.

    1. Notice of Site Visit for seed projects. An organized site visit is scheduled for Wednesday, April 11, 2018, beginning at 9:30 am Eastern. Participants arriving at the main gate after 9:30am may be denied access by security forces. Participants shall sign in on the attendance roster.

    2. Section 00010 changes. Attachment 7- Asbestos Survey and Lead-Based Paint Inspection for Buildings 19 and 20, is added.

    Attachments D-1 and D-2 are revised to remove language providing instructions in the "Detailed Price Proposal" section.

Site visit photos added on 4/2.

Site visit is on March 28, 2018 @ 10am in Jacksonville, FL. Please let us know if you would like to attend.

RFIs due to ABBA Construction no later than Tuesday, April 17th by 3pm.

Summary - MATOC solicitation involves and requires seperate proposals/quotes for two Seed Projects:

Alter Weapons Release Building 1020 - LSGA132001

Repair/renovate the interior and exterior of the single story building. Work will include, but not limited to the upgrade of all electrical, mechanical, lighting, fire suppression and detection, HVAC, plumbing, security, and communication infrastructure systems, reconfiguration of work spaces to include secure and non-secure areas, and replacement of interior finishes, resurfacing of external walls, replacement of windows and doors, and installation of new metal seamed roof system. Installation of lightning protection system and removal of a concrete wall between two work areas will be Option Items.

Add to and Alter Weapons Release Building 1019 - LSGA132007

Repair/renovate the existing 4,000 sf, single story building, and build a 3,200 sf addition. Work will include, but not limited to the upgrade of all electrical, mechanical, lighting, fire suppression and detection, HVAC, plumbing, security, and communication infrastructure systems, reconfiguration of work spaces to include secure and non-secure areas, and replacement of interior finishes, resurfacing of external walls, replacement of windows and doors, and installation of new metal seamed roof system.

Quick Contact